{"id":558,"date":"2026-02-06T19:12:20","date_gmt":"2026-02-06T17:12:20","guid":{"rendered":"https:\/\/gpm-project.it\/en\/?page_id=558"},"modified":"2026-11-02T11:38:48","modified_gmt":"2026-11-02T09:38:48","slug":"tunnel-asciugatura","status":"publish","type":"page","link":"https:\/\/gpm-project.it\/en\/tunnel-asciugatura\/","title":{"rendered":"Drying tunnel"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"558\" class=\"elementor elementor-558\" data-elementor-post-type=\"page\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-bc9fab3 elementor-section-full_width elementor-section-height-default elementor-section-height-default\" data-id=\"bc9fab3\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-78c3e33\" data-id=\"78c3e33\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-b024a35 elementor-widget elementor-widget-html\" data-id=\"b024a35\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"html.default\">\n\t\t\t\t\t<!-- GPM PROJECT \u2013 SCHEDA: Tunnel asciugatura -->\n<!-- Pagina: https:\/\/gpm-project.it\/en\/tunnel-asciugatura\/ -->\n<div class=\"gpm-prod\">\n\n <div class=\"gpm-wrap\">\n  <header class=\"gpm-head\">\n    <p class=\"gpm-eyebrow\">Our solutions<\/p>\n    <h1 class=\"gpm-title\">Drying tunnel<\/h1>\n    <div class=\"gpm-title-line\"><\/div>\n  <\/header>\n\n <div class=\"gpm-block\">\n  <div class=\"gpm-body\">\n    <figure class=\"gpm-media\"><a href=\"https:\/\/gpm-project.it\/en\/wp-content\/uploads\/2026\/02\/image-4.png\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"gpm-16-1-main\"><img decoding=\"async\" src=\"https:\/\/gpm-project.it\/en\/wp-content\/uploads\/2026\/02\/image-4.png\" alt=\"Drying tunnel\"><\/a><\/figure>\n    <p>Made entirely of AISI 304 stainless steel.<\/p>\n    <p>Lengths from 2000 to 5000 mm, depending on line speed and product type.<\/p>\n    <p>Motorized container conveyor inside the tunnel, of various types depending on the container to be treated.<\/p>\n    <p>One (1) high-capacity blower approximately every one (1) metre of tunnel (10 m\u00b3\/min \u2013 7.5 kW). A series of adjustable drying blades removes water from the top, sides and bottom of the containers.<\/p>\n    <p>Complete with noise-reducing enclosure (&amp;lt; 95 dB).<\/p>\n    <p>Stainless steel water collection tank.<\/p>\n    <p>Openable anti-splash side panels.<\/p>\n    <p>Possible residual water 0.1 \u2013 0.3 g\/container.<\/p>\n    <p>Electrical system with inverter motor control, to be integrated into a machine supplied by GPM Project or with an independent electrical panel.<\/p>\n    <p>Possible residual water 0.1 \u2013 0.3 g\/container.<\/p>\n    <p>Electrical system with inverter motor control, to be integrated into a machine supplied by GPM Project or with an independent electrical panel.<\/p>\n  <\/div>\n <\/div>\n <\/div>\n\n <section class=\"gpm-cta\">\n  <div class=\"gpm-wrap gpm-cta-inner\">\n    <div>\n      <p class=\"gpm-cta-kicker\">Let\u2019s talk about your project<\/p>\n      <h2 class=\"gpm-cta-title\">Do you have a specific requirement?<\/h2>\n      <p class=\"gpm-cta-text\">Our team is at your disposal to analyse your production process and design the solution best suited to your needs.<\/p>\n    <\/div>\n    <a class=\"gpm-btn\" href=\"https:\/\/gpm-project.it\/en\/contatti\/\">Request information \u2192<\/a>\n  <\/div>\n <\/section>\n\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Our solutions Drying tunnel Made entirely of AISI 304 stainless steel. Lengths from 2000 to 5000 mm, depending on line speed and product type. Motorized container conveyor inside the tunnel, of various types depending on the container to be treated. One (1) high-capacity blower approximately every one (1) metre of tunnel (10 m\u00b3\/min \u2013 7.5 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-558","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/gpm-project.it\/en\/wp-json\/wp\/v2\/pages\/558","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gpm-project.it\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/gpm-project.it\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/gpm-project.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gpm-project.it\/en\/wp-json\/wp\/v2\/comments?post=558"}],"version-history":[{"count":22,"href":"https:\/\/gpm-project.it\/en\/wp-json\/wp\/v2\/pages\/558\/revisions"}],"predecessor-version":[{"id":1730,"href":"https:\/\/gpm-project.it\/en\/wp-json\/wp\/v2\/pages\/558\/revisions\/1730"}],"wp:attachment":[{"href":"https:\/\/gpm-project.it\/en\/wp-json\/wp\/v2\/media?parent=558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}